MEMORANDUM
TO:
| Pittsfield Charter Township Board of Trustees
| THROUGH:
| Mandy Grewal, Township Supervisor
| FROM:
| Matthew Best, Director of Municipal Services
| DATE:
| September 14, 2022
| SUBJECT:
| Authorize the Supervisor and Clerk to enter into an Agreement with Stantec Consulting for engineering services for two mid-block crossings at (1) Addington Lane and (2) Lohr Road for a cost not to exceed $37,500.00, subject to Township Attorney approval
|
|
| | | | | | | | BOARD ACTION REQUESTED: Authorize the Supervisor and Clerk to enter into an Agreement with Stantec Consulting for engineering services for two mid-block crossings at (1) Addington Lane and (2) Lohr Road for a cost not to exceed $37,500.00, subject to Township Attorney approval |
| | | | | | | | BACKGROUND: Having set the regional standard on non-motorized connectivity within a suburban landscape, Pittsfield Township is continually responding to the needs of our community to improve upon our multimodal transportation network. To that end, we have identified the following projects:
1. Midblock crossing at Lohr Road: This is being suggested to provide for safe north-south movement of bike and pedestrian traffic, which is significant and projected to increase in the future with connectivity between residential and retail. The project’s engineering cost (not to exceed $17,500) will be funded through the General Fund.
2. Midblock crossing at Addington Lane and Stone School Road: A pedestrian crossing is proposed at Addington Lane on Stone School Road to allow for safer movement of the pedestrian traffic flowing East/West from residential areas to the Stone School Greenway and further north to Ellsworth. The project’s engineering cost (not to exceed $20,000) will be funded through the General Fund.
|
| | | | | | | | IMPACT ON TOWNSHIP'S HUMAN RESOURCES: No Impact
IMPACT ON TOWNSHIP'S BUDGET: This would be paid out of General Fund (220-000.000-970-000)
IMPACT ON INDIRECT COST: No Impact
IMPACT ON OTHER TOWNSHIP DEPARTMENTS OR OUTSIDE AGENCIES: No Impact
CONFORMITY TO TOWNSHIP POLICIES: Conforms |
|